Date:  4-15-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Studying Plans

Studied installation of the elevator including the manufacturing of the counter weight made from lead. Made a list of what to order in order to have all the required rawmaterial. There is also a optional plans change regarding the ball joints used for the elevator installation. Optional now, bushings from Nylon, Polyamid 6.6 or Delrin (POM). I go for the Delrin.